Your crypto.
Privately yours.

2π Wallet is a self-custody EVM & Bitcoin wallet with built-in privacy swaps, airgapped cold wallet generation, and cross-chain bridging — all in one app.

6+Supported chains
1.00%Service fee for private swaps
24-wordCold wallet seed
100%Self-custody

A wallet built for
real privacy

Manage ETH, BNB, MATIC, AVAX, BTC and hundreds of tokens across multiple chains. Full self-custody — your keys, your crypto. No accounts. No tracking.

✓
EVM + Bitcoin in one app
Ethereum, BSC, Polygon, Avalanche, Base and Bitcoin from a single seed phrase
✓
WalletConnect support
Connect to any dApp including the 2π Privacy Swap directly from the app
✓
Native in-app swap
Swap tokens directly within the wallet without leaving the app — no browser needed
✓
View mode & address book
Monitor any EVM or BTC address in read-only view mode. Save addresses for quick selection when swapping or sending
Get it on Google Play CLOSED TESTING Request beta access →
EVM wallet mode BTC wallet mode View mode

tap to switch mode

Powered by SilentSwap SilentSwap Privacy Protocol

Swap privately.
Break the chain.

The 2π Privacy Swap routes your transactions through SilentSwap's privacy infrastructure — unlinking your source and destination addresses. You keep full control of your funds. Send from ETH, receive on Base, BNB, Polygon or any supported chain.

🔒
Privacy by default
Your swap is routed privately — no direct on-chain link between sender and recipient
⚡
Split to multiple addresses
Send one input to up to 5 different output addresses with custom split percentages
🌐
Use with any wallet
2piswap.com works with MetaMask, TrustWallet, WalletConnect and browser extension wallets
₿
Bitcoin source & destination
Swap BTC ↔ EVM using the 2π Wallet app or any WalletConnect Bitcoin wallet such as Phantom or Keplr
🔀
Standard swap mode
Toggle between private and standard swap modes. Standard swaps are fast cross-chain bridges — privacy routing is optional
Open 2π Privacy Swap ↗ How it works
2π Privacy Swap

Privacy swap in 4 steps

Simple to use, powerful under the hood. No accounts, no KYC, no traces.

01
Connect your wallet
Connect via WalletConnect or MetaMask on 2piswap.com. No account needed — just your wallet.
02
Choose assets & amounts
Select your source token and chain, set the amount, then choose your destination token, chain and recipient address.
03
Execute privately
Your swap is routed through SilentSwap's privacy infrastructure. The link between sender and recipient is broken on-chain.
04
Funds arrive
EVM swaps typically complete in 1–3 minutes. Bitcoin swaps take up to 10 minutes due to Bitcoin block times. Track progress live in the app or on 2piswap.com.

Airgapped cold wallet
generation on device

Generate a 24-word seed phrase and derive EVM + Bitcoin addresses entirely offline. The private key is permanently deleted after you confirm your words — only public addresses are saved to your address book.

STEP 01
Go offline
Turn off WiFi and mobile data or enable Airplane mode. The app verifies your device has no internet connection before generation begins.
STEP 02
Generate seed
A 24-word BIP39 seed is generated using cryptographically secure entropy. All operations are 100% offline.
STEP 03
Write words down
Words are displayed 6 at a time. A 60-second timer ensures you have time to write each group carefully on paper.
STEP 04
Confirm Seed
Re-enter all 24 words to confirm you recorded them correctly. Autocomplete helps you select words accurately.
STEP 05
Key deleted
After confirmation the private key is permanently wiped from memory. Your EVM and BTC addresses are saved to the address book.
STEP 06
Receive only
Use the cold wallet address as a private receive address for swaps. To spend, import the seed into Trezor or Ledger.
Security note: Your seed is generated in an airgapped environment — your device has no internet connection during key creation and derivation. The private key is permanently deleted before going back online. Screenshots are blocked on all seed generation screens.

Cross-chain by design

Swap between any supported chain privately.

Ethereum
BNB Chain
Polygon
Avalanche
Base
Bitcoin
1.00%
service fee for privacy swaps — no hidden costs

Service fee plus normal bridge and network gas fees. No subscription. No account. No surprises.

No subscription fees
No account required
No hidden costs

Common questions

Yes — 100% self-custody. Your seed phrase and private keys never leave your device and are never shared with any server. Only you have access to your funds.
No — 2piswap.com works with any EVM-compatible wallet including MetaMask, Trustwallet, Phantom and any WalletConnect-compatible wallet. The 2π Wallet app gives you the best experience but it is not required.
The SilentSwap protocol breaks the on-chain link between your source and destination addresses. An observer on the blockchain cannot easily trace that the sending address and receiving address are connected. For maximum privacy, use a cold wallet address as your receive address.
A cold wallet address is a public address whose private key was generated offline and then permanently deleted from your device. When you receive funds to a cold wallet address you have never used on a hot device, there is no transaction history that links it to your identity — making it the ideal receive address for privacy swaps.
Yes — Bitcoin is supported both as a source and destination. Connect your Bitcoin wallet via WalletConnect using the 2π Wallet app or any compatible BTC wallet. You can swap BTC → EVM tokens or EVM tokens → BTC.
Most EVM swaps complete within 1–3 minutes. Bitcoin transactions may take up to 10 minutes due to Bitcoin's block time. You can track your swap live on 2piswap.com.
If a swap cannot be completed, the SilentSwap protocol includes a refund mechanism. You can check refund eligibility from the Recent Orders panel in the app or on 2piswap.com. Expired orders can be refunded on the Avalanche network.

Get in touch

Have a question, found a bug, or need help with a swap? We're here to help. Reach out and we'll get back to you as soon as possible.

Response times are typically within 24–48 hours. For swap refund eligibility, please include your order ID from the Recent Orders panel in the app.

Ready to swap privately?

Download the 2π Wallet app or open the swap page directly — no account required.

Get it on Google Play CLOSED TESTING Request beta access →
🔒 Open 2π Privacy Swap ↗

iOS coming soon  ·  Self-custody  ·  No account required